
01
Material preparation
Confirm the insulation material and panel construction for the application.
LANGFANG FANCY / Manufacturing
Production equipment, panel racks and manufacturing lines shown in the original manufacturer brochure.

01
Confirm the insulation material and panel construction for the application.

02
Process composite panels, polymerized EPS or cement-based boards on their respective lines.

03
Organize production, curing and finished-panel storage.

04
Review drawings, product requirements and construction details with the project team.